If you decide to close the deal with our roof and opt for a profiled sheet, you made the right choice. To receive a turnkey high-quality installation of a profiled sheet on your house’s roof, you need to consider a Roofing Contract Template. When concluding a contract for installing a roof made of corrugated roofing board on a turnkey basis, all work on the installation of the corrugated sheet will be performed efficiently, on time, and without surprise.
When concluding a roofing contract, check out Lumin PDF forms for installing a turnkey corrugated roofing contract template. This way, you simultaneously receive a guarantee both for the materials (i.e., the corrugated roofing board itself) and for installation work in one roofing contract template. With various profile types and different protective sheeting, it isn’t easy to make the right choice. Call our qualified managers, and they will help you choose precisely the professional sheet that you need.
If you are not sure of the roofing measurements, order the service of a manager’s visit to the job site. He will not only advise on the choice of the corrugated board but also calculate the required amount of roofing profiled sheet and additional materials. When concluding a roofing contract template for purchasing goods, delivery service from our warehouse to the project is an option. In this case, you need to contact our managers, since the cost of delivery depends on the region.
Installation of Turnkey Corrugated Board
This procedure includes initial measurements of the project, delivery of materials from our warehouse to the project, installation of a roof of any complexity from a profiled sheet. When installing a roof, you can count on an additional discount. At the same time, you receive a written guarantee for both installation and materials. It is necessary to take into account aesthetic qualities such as the surface color and waveform of the corrugated sheet, and technical ones such as the thickness of the metal, the wave height of the corrugated sheet, and the type of coating. Important indicators depend on this: what kind of load the roof will carry from the corrugated board, and how long its service life will last.
When replacing a roof made of slate with a profiled sheet, it is essential to evaluate the rafter system’s condition, since due to leaks, the wood can rot or fungus can grow on it. To do the job correctly, you need to know the nuances of arranging the roof from a profiled sheet, and experienced specialists should do the work. In order to cover the roof with a corrugated board to a high degree of quality, skill and experience in this type of work is required. Our qualified installers will install the corrugated board on the roof of any degree of complexity:
- On a pitched roof
- On a gable roof
- On a hip roof
- On a half-hipped roof
- On a multi-gable roof
The cost of installing a profiled sheet depends on the complexity of the roof structure. To calculate the installation of a roof from the corrugated board, the price for the work of laying a corrugated sheet per square foot is multiplied by the total roof area. You can fix the prices for installation work in the roofing contract. Calculating the amount of corrugated board for the roof will help you determine the approximate amount of profiled sheet for arranging the roof of your house. One thing to keep in mind is that material consumption is more significant with complex roof structures.
If you have not completed the roofing contract for the installation of the roof:
RISK |
SOLUTION |
To end up with a different result than expected.
|
All the wishes of the customer are reflected in the roofing contract for each project.
|
The initial installation price can be significantly changed since it was not initially approved in the roofing contract.
|
A binding roofing contract with a final calculation of the installation cost is attached to each project.
|
The deadlines for completing the work are not being met. As a result, it may delay the completion of the repair for an indefinite time.
|
All the terms of the installation are necessarily prescribed in the roofing contract. Therefore we strictly adhere to the roofing contract template. They are thus responsible for any delay or disruption of the terms of work.
|
Installation is carried out by an unverified roofing contractor with little experience in installation work: you can get a roof that will leak at the first rain, and without any obligation to correct deficiencies.
|
To enter into a roofing contract with experienced certified performers. Specify in the roofing contract high requirements for the quality of installation work
|
You may incur high unforeseen costs associated with roofing remodeling and fixing jambs.
|
A written guarantee included in the roofing contract for both materials and installation, including warranty and post-warranty repair by our qualified specialists.
|
A significant reduction in the life of the roof.
|
The solution is to include a job guarantee in the roofing contract.
|
Selection and Calculation of the Amount of Required Material
Manufacturers offer a wide selection of profiled sheets with different thicknesses of the metal base, different profile sections, and various types of protective coatings and a wide range of colors, which allows the use of profiled sheeting for the most daring design projects. To do this, divide the length of the slope by the working width of the sheet. The result is rounded up. The working width is the part that will not be covered by the next sheet during installation – that is, the total width minus the overlap. How do you calculate the length of a row? You should measure the distance from the eaves to the ridge and add the eaves’ length overhang to the result. To this result, add the number of rows multiplied by 0.15 m (overlap distance).
Transportation, Unloading, and Storage of Corrugated Board
During transportation, unloading, and storage, every effort must be made to prevent excessive bending of corrugated board sheets, and any other type of mechanical damage to the surface of the sheets. During transportation, it is unacceptable to hang the edge of the sheets over the vehicle’s side. When unloading, there must be a sufficient number of loaders, but not less than two. When storing, the profiled sheets are laid with wooden blocks between them, but in stacks not higher than 7 inches to avoid excessive pressure on the profile.
Rafter device
When replacing the roofing, a mandatory check of the rafter system is required for the absence of rot and fungus on the wood. The entire rafter system is mounted only from dry wood treated with antifungal solutions. To avoid bending of the profiled sheets, the distance between the rafters should be no more than 90 inches. After installing the rafters, it is necessary to check the squareness of the roof slopes. In this case, the diagonal difference should not exceed 0.5 inches.